| by |
Mike Busch |
Airworthiness
Directives have been with us since the 1940's, but
it seems as if the industry's attitude toward them has changed
dramatically in recent years. Twenty years ago, manufacturers
would often brag in their sales literature that their airplanes
or engines "have never had an AD issued against them."
Issuance of an AD was considered a black mark against a manufacturer,
suggesting that the firm's engineering or quality control was
not up to par.
In the last decade, that attitude appears to have made a 180-degree
turn. Nowadays, it seems as if most ADs that come out of the FAA
are being issued at the request of the manufacturers. Sometimes
firms ask the FAA to issue an AD at the advice of their lawyers
in an effort to limit their liability exposure. In other instances,
their requests are prompted by honest-to-goodness safety concerns.
But we're troubled by an increasing incidence of manufacturer
requests for ADs that look suspiciously as if they're intended
to enhance the company's revenues and/or hurt their competition.
And what's really disturbing is that the FAA seems to be going
along with these requests, issuing ADs without first doing independent
due-diligence to establish that they are justified by the facts.
That's what apparently occurred with two recently-proposed crankshaft
ADs. In two rulemaking actions last year, the FAA declares that
they've identified an "unsafe condition" affecting the
crankshafts of 60,000 TCM and Lycoming engines in many of the
world's most popular light airplanes, and says it wants at least
20,000 of those crankshafts to be scrapped and replaced, at a
cost to owners of $50 to $100 million. Ouch!
Now, before taking this kind of drastic action, you'd think the
FAA would need to be pretty doggone sure that there is a real
safety problem with the existing crankshafts and that the replacement
cranks actually solve the problem. But it sure looks to us as
if the FAA simply took the word of TCM and Lycoming that there
is a problem...and that neither the FAA's own statistics on crankshaft
failures nor independent studies support the manufacturer's claims.
To make matters worse, we don't think it's an accident that TCM
and Lycoming have adopted pricing policies on replacement crankshafts
that will compel most affected owners to exchange their engines
for factory remans, to the severe detriment of field overhaul
shops who nowadays are the principal competitors of TCM and Lycoming.
In short, we smell a rat.
TCM crank history
TCM has used two different processes to cast the steel billets
used in forging their crankshafts. For decades, the cranks were
manufactured using a conventional "airmelt" process.
But in the late 1970s, TCM became concerned about metallurgical
"inclusions"-tiny air bubbles trapped inside the steel
as the billet is poured-which cannot be detected through ordinary
magnaflux inspection and which might weaken the cranks. So between
1978 and 1980, TCM gradually switched over to a different process
called "vacuum arc remelt" (VAR) to eliminate the possibility
of inclusions. They also increased the crankshaft diameter slightly
on their 520-series engines. However, they continued to re-use
serviceable airmelt crankshafts in their factory-rebuilt engines.
It is very rare for a crankshaft to fail because of a material
or manufacturing defect. According to FAA Advisory Circular AC20-103,
the vast majority of crankshaft fractures are the result of undetected
or unreported prop-strike damage, out-of-balance propellers, spun
bearings, excessive oil temperatures, contaminated oil, and other
lubrication failure situations.
Nevertheless, TCM became convinced that a small number of crankshaft
failures in their 360- and 520-series engines were due to "unexplained
subsurface origin fatigue cracks initiating below the intermediate
main bearing fillets" which could not be detected through
magnaflux inspection. So in 1987, TCM issued Service Bulletin
M87-5 which recommended (but did not require) that crankshafts
be inspected at overhaul using ultrasonic test equipment capable
of detecting subsurface cracks. Magnaflux inspection continued
to be required.
TCM also persuaded the FAA to issue an Airworthiness Directive,
AD 87-23-08, requiring ultrasonic inspection of IO-520 and TSIO-520
crankshafts to detect subsurface cracks, and replacement of the
crankshaft if a crack is found. The impact of this AD was relatively
small: the extra inspection added about $200 to the cost of a
major overhaul or post-prop-strike teardown inspection, but fewer
than 1% of the crankshafts flunked the ultrasonic exam.
TCM: scrap all airmelt cranks!
Five years later, TCM decided they wanted to get all the older
airmelt cranks out of the system. In September, 1992, they issued
Mandatory Service Bulletin M92-16 which required that all airmelt
cranks (or cranks whose manufacturing process could not be determined)
be scrapped and replaced with a VAR crankshaft at the next major
overhaul or teardown. About 25,000 airmelt-crank engines were
affected. They also announced that all factory-new and factory-rebuilt
engines would be equipped with VAR cranks.
New VAR crankshafts have list prices which vary from $6,700 to
$8,200. However, TCM announced a special exchange program whereby
old airmelt cranks could be traded for brand new VAR cranks for
a mere $2,200. This was presumably TCM's way of trying to persuade
overhaul shops to comply with M92-16.
But then a funny thing happened. TCM quietly established a policy
of accepting runout airmelt-crank engines as cores in exchange
for factory-rebuilt engines with no up-charge. This meant that
the owner of an airmelt-crank engine would pay a penalty of at
least $2,200 on a field overhaul, but no penalty at all on a factory
reman. Needless to say, the overhaul shops and their trade association,
the Aeronautical Repair Station Association (ARSA), cried "foul!"
TCM responded by going to the FAA and asking them to put "teeth"
into M92-16 by turning it into an Airworthiness Directive. The
FAA agreed, and in June 1993 issued a proposed AD (58 FR 39748)
that would supersede AD 87-23-08, eliminate its ultrasonic inspection
requirements, and mandate replacement of airmelt crankshafts with
VAR cranks anytime the case was split. The proposed AD would also
expand the affected population of engines to include 360-series
engines as well as 520-series.
The FAA was inundated by negative responses to its NPRM, mostly
attacking the FAA's lack of data justifying the need for the AD
and disputing the FAA's estimate of economic impact as unrealistically
low. The principal commenter was ARSA, who claimed the FAA's crankshaft
failure data was anecdotal and not representative of the entire
fleet.
The wheels of FAA rulemaking grind slowly. Two years later in
August, 1995, the FAA issued a supplemental NPRM (60 FR 43995)
to address the criticisms by ARSA and others by publishing additional
data in support of the proposed AD. In the supplemental notice,
the FAA dismissed its own Service Difficulty Report (SDR) database
as inaccurate and elected to rely on TCM-supplied failure analysis.
According to this analysis, there are approximately 18,000 airmelt
and 25,000 VAR cranks in service in 520-series engines as of 1994,
and that between 1986 and 1994 there were 40 failures of airmelt
crankshafts but only 3 failures of VAR cranks. The implication
was that airmelt cranks were 15 times more likely to fail than
VAR cranks. For 360-series engines, the numbers quoted were 5,000
airmelt cranks and 10,800 VAR cranks in service, and 8 airmelt
failures but only 1 VAR failure during the same period. Again,
a failure ratio of more than 15 to 1. Pretty convincing, wouldn't
you say?
Damned lies and statistics
Not so fast, said ARSA. Two weeks after the supplemental notice
issued, ARSA submitted a Freedom of Information Act request to
the FAA, asking for the source information (primarily TCM warranty
claims) on which the FAA justification was based. The FAA declined
to provide this data, indicating that it was proprietary to TCM.
In October, 1995, ARSA joined forces with three other alphabet
groups (the Aircraft Owners and Pilots Association, the Cessna
Pilots Association, and the National Air Transportation Association)
to file a response in opposition to the supplemental NPRM. They
criticized the FAA for relying on data that has not been made
available for public scrutiny, and suggested that TCM's data might
be "presented in such a way as to favor the commercial goals
of the party that compiles it (such as selling more crankshafts)."
They also pointed out that the FAA elected to ignore its own SDR
database (which did not support the need for the proposed AD),
and also ignored the analysis submitted by ARSA in February, 1994.
ARSA's analysis was based on the results of ultrasonic testing
of crankshafts required by AD 87-23-08 by TCM-authorized inspection
facilities throughout the U.S. The ARSA data showed that companies
had detected 27 subsurface fatigue failures out of 3,821 airmelt
crankshafts subjected to ultrasonic test, for a failure rate of
.707%, and had detected 5 failures out of 488 VAR cranks tested,
for a failure rate of 1.025%. ARSA pointed out that these failure
rates are statistically equivalent.
Furthermore, the joint Association response points out that the
FAA's own supplemental notice "exhibits a lack of confidence
in the superiority of VAR crankshafts." The proposed AD requires
that VAR crankshafts undergo ultrasonic testing at every removal,
so that "clearly the FAA recognizes that VAR crankshafts
are subject to the same unsafe condition as airmelt crankshafts.
The FAA has offered no evidence to conclude that unsafe conditions
exist in airmelt crankshafts that do not exist in VAR crankshafts.
The two types of crankshafts should be treated in a comparable
fashion."
The Cessna Pilots Association (well known for its activism in
opposing oppressive ADs) analyzed Cessna production figures, and
determined that Cessna delivered aircraft with approximately 30,000
airmelt crankshafts versus only about 8,500 VAR crankshafts. Assuming
that roughly the same percentages hold true for Beech aircraft,
CPA concluded that the TCM-supplied population estimates that
the FAA relied upon (18,000 airmelt vs. 25,000 VAR) "are
either greatly in error or indicate that the airmelt crank will
disappear without the need of regulatory action."
That's where things stand as this article is being written. The
next move is up to the FAA. They may issue an AD, issue yet another
NPRM, or drop the matter altogether.
Realistically, what the FAA does may not make any real difference.
TCM's Mandatory Service Bulletin M92-16 already has the force
of law on Part 135 operators. Furthermore, no reputable engine
shop would fail to comply with such a mandatory service bulletin
because of potential liability concerns. So with the AD or without
it, airmelt crankshafts are going on the scrap heap.
TCM has no obligation to hold the line on its $2,200 special trade-in
price, and in fact has already increased it once to $2,330. TCM
continues to accept airmelt cores in exchange for factory remans
with no up-charge, making the field overhaul shops the big losers
in this affair.
The Lycoming Crank Situation
A strikingly similar scenario is now playing out with respect
to four-cylinder Lycoming engines that drive fixed-pitch props.
At Lycoming's request, the FAA has proposed an Airworthiness Directive
that would require the inspection and possible replacement of
the crankshafts in an estimated 46,000 U.S. aircraft.
The story began in October 1993, when the British CAA received
a report of a Piper PA-28-161 Warrior that made a forced landing
due to a crankshaft failure that caused the propeller to separate
from the aircraft. Analysis of the crankshaft indicated that the
failure was caused by "a high cycle reverse torsional fatigue
mechanism that had initiated from a number of corrosion pits in
the crankshaft bore." Ya just gotta love those Brit engineers!
The Warrior's Lycoming O-320-D3G engine had 1,950 hours SMOH and
the crankshaft had 4,429 hours and 15 years since new.
In plain (American) English, here's what investigators discovered.
Crankshafts designed for use with constant-speed propellers are
hollow in the front, allowing oil pressure from the governor to
reach the propeller hub and adjust the blade pitch. Lycoming elected
to use the same sort of hollow-front crankshaft for most of its
fixed-pitch prop installations, simply installing an expansion
plug in the front of the crankshaft to retain the oil. That's
apparently where the problem lies: in engines with the plug installed,
the oil in the crankshaft hollow is stagnant, and crankshaft rotation
centrifuges this trapped oil and can create a buildup of acid-rich
sludge on the inner surface of the crankshaft bore. The sludge
promotes internal corrosion, and the corrosion pits can become
stress-risers that ultimately lead to crankshaft fracture near
the propeller flange.
As a result of the British Warrior incident and several other
reports, Lycoming issued Mandatory Service Bulletin 505A in October,
1994, affecting all Lycoming 235- and 290-series engines and most
Lycoming 320- and 360-series engines with fixed-pitch propellers.
The SB requires inspection of the plugged-up crankshafts immediately
if they are more than ten years old, or within ten years of ship
date if they are recent-vintage. The mechanic must remove the
prop and the plug, clean the forward four inches of the crankshaft
bore, and inspect the surface for corrosion. Surface corrosion
may be removed, but only if the inner diameter of the crankshaft
remains 1.91" or less. If further corrosion or pitting is
found, the SB calls for the crankshaft to be removed from service
immediately (which would require a preemptive engine teardown).
New crankshafts for these engines cost between $4,500 and $6,500
apiece.
Lycoming also asked the FAA to issue an Airworthiness Directive
against the crankshafts in these engines. The FAA agreed, and
published a proposed AD (60 FR 58580) in November, 1995. The proposed
AD is somewhat more lenient that Lycoming's SB, allowing crankshafts
to remain in service for five years after pitting is found, provided
repeated fluorescent penetrant inspections reveal no cracks. But
five years after pitting is detected, or anytime FPI reveals cracks,
the AD would require that the crankshaft be replaced.
The proposed AD requires initial inspection within six months
or 100 hours for engines with at least 1,000 hours, or within
ten years if that is reached first. Thereafter, visual inspections
are required every five years if no pitting is found, or FPI every
100 hours after pitting is detected.
How many crankshafts will exhibit pitting and need to be replaced?
It depends who you ask. In the cost analysis portion of the proposed
AD, the FAA estimates that 10% of the cranks will be pitted and
require replacement at each overhaul. But the Lycoming factory
claims that most of the cranks they see coming back as
cores are pitted and need to be scrapped. If Lycoming is right,
then the cost impact of the proposed AD will be an order of magnitude
bigger than what the FAA claims it is.
No supporting data
For rulemaking action with a potential cost impact of $15 to $50
million (depending on whom you believe), the proposed AD is shockingly
devoid of supporting data. The only justification cited by the
FAA is the British Warrior forced landing, plus ten additional
reports allegedly received by the FAA but about which absolutely
no details are offered.
The proposed AD is opposed by AOPA and Cessna Pilots Association,
among other commenters. AOPA filed a FOIA request demanding to
know what data the FAA used to justify the five-year limitation
on crankshafts which are found to be pitted but not cracked. Failing
to get a substantive response, AOPA requested a two-month extension
to the original January 29, 1996, deadline for public comments.
The Cessna Pilots Association (CPA) got involved because the Cessna
152s and 172s represent the single largest group of aircraft that
would be affected by this AD. CPA filed a FOIA request asking
for details of the "ten additional reports" that the
FAA says they used to determine that an unsafe condition exists
that justifies the AD. The FAA replied that they could not provide
this information because it was proprietary to Lycoming! (Sound
familiar?)
CPA also asked the FAA to provide SDR reports filed during the
past five years that involved flange-end crankshaft failures in
Lycoming O-235 and O-320 engines (as used in the C152 and C172,
respectively), and the FAA did so. The SDR database revealed some
interesting facts. There was not a single report of a flange-end
crankshaft failure in O-235 engines, although there were some
fractures back in the solid portion of the cranks (probably due
to lubrication failure).
For O-320 engines, there were five reports of flange-end crankshaft
problems in five years, a very modest number. Only three of those
reports involved actual crankshaft failures; the other two involved
oil leaks that were ultimately traced to crankshaft cracks. One
of the three crankshaft failures involved an aircraft that had
obviously had a prop strike. In a second failure report, the reporting
A&P stated that he could not rule out the possibility that
the aircraft had an unreported prop strike (making it sound as
if he suspected as much). Even discounting all of this, five reports
of failures in five years from a population of more than 20,000
engines would make the O-320 crankshafts among the least failure-prone
in the fleet.
Most significantly to CPA, not one of the five SDRs involved Cessnas!
Three involved Piper PA-28-161 Warriors just like the British
aircraft that started the whole thing, one involved a Piper PA-18
Super Cub, and the last one involved a Socata TB-9 Tobago. Yet
the largest group of owners that would be affected by the proposed
AD are Cessna owners.
Keep in mind that Lycoming is not offering a redesigned solid
crankshaft to replace the hollow ones that they claim are corroding
away from the inside. The new cranks will be subject to the same
corrosion problem as the ones they replace. Also, Lycoming is
offering no "special deal" on crankshafts. Owners who
need a new crank will have to pay $4,500 or more to get one. But
just as with the TCM situation, Lycoming is not charging any up-charge
for pitted-crank cores that are exchanged for Lycoming factory
remans. So it would appear once again that the field overhaul
shops are the big losers here, and Lycoming stands to be the big
winner.
Final thoughts
When the general aviation market imploded in the early 1980s,
both TCM and Lycoming went through a period of denial, waiting
for their OEM market to come back to life. But by 1990, both companies
recognized that this just wasn't going to happen. They realized
that they were now basically in the overhaul business, and that
their competition was the field overhaul shops.
Both companies responded to this revelation by slashing the prices
of factory-rebuilt engines while simultaneously hiking parts prices,
putting field overhaulers at a tremendous disadvantage and driving
many of them (including such well-known names as Mid-States, Schneck,
and Western Skyways) out of business. The overhaul shops that
managed to survive reacted by buying cylinder assemblies and everything
else they could get from PMA firms like Superior and ECI, and
by reducing their need for new parts by reworking old ones whenever
possible.
All of this is arguably in the great American tradition of a laissez-faire
free-market economy. But when manufacturers like TCM and Lycoming
start using a government agency like the FAA as a weapon to gain
commercial advantage over their competition, it's time to blow
the whistle. Perhaps you can't blame the manufacturer's for trying.
But the FAA has an obligation not to issue an AD without first
independently verifying that there's a genuine threat to safety
that the AD will rectify. From what we see, the FAA isn't doing
its job. Toot toot!