787 Smokes ‘Em Up

0

Don’t see a video screen?
Try disabling ad blockers and refreshing this page.
If that doesn’t work, click here to download the video directly.

Although a first flight for the Boeing 787 Dreamliner will have to wait until engineering fixes strengthen the wing attachments, that doesn’t mean the aircraft has to sit idle. Engineers and test pilots got to run it up and down the runway at Paine Field last Tuesday in its first taxi tests. The aircraft reached speeds of about 100 knots in at least one run and the brakes were tested. They apparently work.

Boeing hasn’t announced any further testing, and a date for the first flight still hasn’t been determined.

CLICK FOR LARGER INDIVIDUAL IMAGES
EACH IMAGE WILL OPEN IN A NEW WINDOW

LEAVE A REPLY